Skip to main content
Tag

Mark Savel

3140 Dufferin St

3140-3170 Dufferin St. To Be Redeveloped

By Architecture, New Condo Developments

What Do They Want to Build at 3140-3170 Dufferin Street and 60-68 Apex Road?

Add another application to the developing Dufferin St strip! In 2015, RioCan submitted an application to amend the Official Plan at 3140-3170 Dufferin Street and 60-68 Apex Road.  Currently the site is home to TD Canada Trust, Staples, Tim Hortons and Swiss Chalet… but if all goes according to plan, 2 new condo towers will be built on the site.

The application is calling for two mixed-use buildings of 28 and 22 storeys separated by a new public road. The proposed redevelopment will include 578 residential units and 5,632 square metres (60,622 square feet) of at grade retail space. It will also include 878 parking spaces, 1135 bicycle parking spaces and even a new public park as part of the redevelopment. Below are some early drawings of what the development may look like:

3140 Dufferin St 3140 Dufferin St


According to the proposal, the building will look as follows:

Building One

Building One (or Block 1), will front on Dufferin Street, will include the development of a 22-storey mixed use building with 263 residential units and 4,848 square metres (52,183 square feet) of grade-related retail and service commercial space.The building will consist of a 5-storey podium along all street frontages, an 8-storey mid-rise component along Dufferin Street and a 17-storey tower component above the 5-storey podium. The podium transitions to a mid-rise component for Levels 6, 7 and 8 located along the Dufferin Street, providing an outdoor amenity area in the northwest quadrant of the 6th level.

A total of 263 units are provided within Block 1, including 92 one-bedroom units, 136 two-bedroom units, 27 three-bedroom units, and 8 live-work units. Amenity spaces are provided on Levels 6, 9, 14 and 18. In total, Block 1 includes 617 square metres of indoor amenity space and 1,869 square metres of outdoor amenity space.

The building includes two levels of underground parking and parking areas central to Levels 2-5, accommodating a total of 444 parking spaces. A total of 667 bicycle parking spaces are provided.

Building Two

Building Two (or Block 2) 

Block 2, located West of Building One, will have a site area of 4,470 square metres (excluding the public park and half of the northsouth public road) and will include the development of a 28-storey mixed use building with 315 residential units and 784 square metres (8,442 square feet) of grade-related retail and service commercial space.  The building will consist of a 6-storey podium and a 22-storey tower. 

The ground floor includes two retail units, one along Apex Road and the other in the northeast corner of the building. The residential lobby has frontage on the proposed new public street located south of the retail unit. The ground floor also includes 10 townhouse units within the podium that front onto the proposed new public park and 6 live/work units within the podium that front the proposed new public street, between the residential lobby and retail unit. The interior of the ground floor is utilized for bicycle parking, waste facilities, elevators and stairs, all accessed by a central hallway. The remainder of the podium (Levels 2-6) is occupied by residential units along the perimeter and a double-height fitness area on Levels 2/3.

Residential units within the podium are accessed by a central hallway connected to the centralized elevators and stairs. An outdoor amenity area is located on Level 4. Additional indoor and outdoor amenity space is provided on Level 9, 14 and 18. The top of the podium, at Level 7, is utilized for a green roof. The tower contains residential units accessed by a central hallway, which is connected to centralized elevators and stairways. The proposed height to the top of the 28th floor is 89.0 metres, with a height of 95.0 metres to the top of the elevator overrun/rooftop mechanical. 

A total of 315 units are provided within Block 2, including 8 bachelor units, 99 one-bedroom units, 149 two-bedroom units, 53 three-bedroom units, and 6 live-work units. Amenity spaces are provided on Levels 2, 4, 9, 14, and 18. In total, Block 2 includes 1,309 square metres of indoor amenity space and 1,012 square metres of outdoor amenity space.

My Thoughts on the Proposal

The success of the Treviso development is proof that Dufferin, North of Lawrence is ripe for development! The west side of Dufferin has much larger lots than the East, and I think utilizing the lands make most sense.  The retail at grade helps keep business in the area, and the towers above can add to the shortage of housing options in both the city – and the Dufferin and Lawrence neighbourhood.  In the City report, there were a lot of items that needed addressing, but my hopes is that they all get sorted out and the Dufferin strip continues to develop!

Overhead Shot Of Male Plumber Working To Fix Leaking Sink In Home Bathroom

REVIEW: My Experience Using Jiffy On Demand

By Home Improvement

The Problem

With the winter winds rolling in, the time had come to do some maintenance at my rental property. All I had to do was turn off the outside water off from in the home – a fairly standard job that I do every year. As luck would have it, the valve wouldn’t close.  So I did what any stubborn male would do… I tightened it until I broke it.  My one problem quickly became three: The water line wasn’t closed, the valve was broken, and I had no time to master the art plumbing.

The Solution – Jiffy on Demand

JiffyOnDemand is a new Toronto based app that makes home maintenance a breeze! They connect homeowners with professionals in a variety of trades – from small jobs like furniture assembly and lawn maintenance, to larger jobs like electrical and duct cleaning… they even have professionals on call for seasonal jobs like BBQ cleaning, and Christmas light installation!

Jiffy on Demand Services

Above is a small sample the services JiffyOnDemand offers

The “Jiffy” concept is to connect homeowners for jobs that need same day attention – but you’re also able to schedule jobs for future dates.

I needed a plumber – and fast! After downloading the app, I typed in “plumbing”, filled in a few details about the job, and was instantly connected with a plumbing professional.  Within minutes I received a phone call from Mike Ginglo from Momentum Mechanical Contractors (so refreshing to actually speak with the person carrying out the work).  I loved that they were able to give an exact timing for when the work would start (instead of a 8 hour window that most trades offer). On the day scheduled for work, Mike followed up with another call to reconfirm the time – I’m a stickler for detail, and was so impressed with how organized he was! 

The JiffyOnDemand app displayed the minimum price and first hour rate of the job as well as a break down of what additional time would cost.  This in itself was a huge timesaver as I didn’t have time to wait for a call back to confirm price. As part of the signup process, you provide them with your credit card number, and they bill you once the job is complete.

Mike and his assistant showed up on time, and got right to work.  The job required replacing the old pipe, valve and hose bib with new parts. Within the hour they had everything done! I’m one of those eager beavers who likes watching the job get done so I can learn for next time.  Mike went the extra mile by explaining what was wrong with the old valve and the benefits of the new one. He even answered my follow up questions via email and offered a few tips for winterizing the house for future seasons – this gave me complete assurance in his expertise and the job preformed!

The Verdict

Had I decided to fix the pipe my self – it would have easily turned into a month long project! From my first few taps with JiffyOnDemand to the overall experience with Mike and Momentum Mechanical – I give them: 4.95 plumber wrenches out of 5 … the only minor improvement would be with communicating the cost of materials.  Jiffy can only display prices for the labour, as the cost of materials vary based on the job! I was charged fairly for the materials, it just would have been helpful to have a rough estimate at the start of the job.